Connection (Elevated Road) from Chongxian to Laoyuhang in Yuhang District
| Project Name | Connection (Elevated Road) from Chongxian to Laoyuhang in Yuhang District |
| Construction Site | Hangzhou, Zhejiang |
| Service Type | PPP Consulting and Tendering Agency |
| Construction Area | The total investment is about RMB 8.604 billion. The total length is about 34.02 km. The bridge width is 26.5 m. |
| Project Characteristics | Elevated bridge is designed for the whole connection. Based on the function, position and traffic forecast, the two-way six-lane first-grade road criteria are adopted. The design speed is 80 km/h. The construction and installation cost RMB 5.07399 billion, excluding the railway-related cost. |

We will contact you within 24 hours.